Monthly Archives: August 2017

The George Massey Tunnel

The George Massey Tunnel  might be a hinder to get a quick ok for a Sunshine Coast Fixed Link. This Link is more important to BC than the proposed 10 lane bridge. (length: 344 ft (104.9 m); height: 24 ft (7.3 m); width: 78 ft … Continue reading

Posted in Uncategorized | Leave a comment

Ferry problems can only be solved with a Fixed Link !

A Fixed Link is a must ! Road accsess to the Sunshine Coast is basic transportation infrastructure, mainland to mainland. The future can not pretend it is an island. Many gulf island can also be connected, by bridge, tunnel or … Continue reading

Posted in Uncategorized | Leave a comment