Gabriola Bridge Study

gabriola study

Gabriola Fixed Link Work-Services

This is the same type of study we have to do for the Sunshine Coast Connector. Terms of reference must be specific to our project. We are ready and look forward to start working.

Advertisements
This entry was posted in Uncategorized. Bookmark the permalink.

2 Responses to Gabriola Bridge Study

  1. Terry says:

    The islands trust was established to preserve the uniqueness of the gulf islands. Building a bridge with 24 hr traffic is against its mandate completely.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s